Project coordination
Working solutions for architecture, construction and engineering sections have been coordinated.
ABOUT THE PROJECT
The construction process was organized on the basis of mutual compatibility of architectural solutions, load-bearing structures and engineering systems. The work schedule ensured the coordination of different specialties in the same field.

DELIVERED WORKS
The works were delivered under a single execution plan that accounted for technical requirements, site conditions and dependencies between stages.
Working solutions for architecture, construction and engineering sections have been coordinated.
Foundation, carrier system, facade and roof works have been performed in stages.
Installation of electrical, water, HVAC and low flow systems is integrated into the construction schedule.
Internal completion, testing, inspection and preparation for use have been carried out.
EXECUTION PROCESS
Initial data, requirements and possible technical limitations are defined.
The scope, resources and execution sequence were defined to suit the project.
Technical teams and operational phases are linked to a single control.
The work performed has been evaluated and the results have been documented accordingly.
PROJECT OUTCOME
Coordination between the architectural and engineering disciplines delivered a functional, safe and operationally ready facility.