Project coordination
Working solutions for architecture, construction and engineering sections have been coordinated.
ABOUT THE PROJECT
The construction process was organized on the basis of mutual compatibility of architectural solutions, load-bearing structures and engineering systems. The work schedule ensured the coordination of different specialties in the same field.

WORKS DONE
Works were organized according to a single implementation plan taking into account technical requirements, site conditions and inter-stage dependencies.
Working solutions for architecture, construction and engineering sections have been coordinated.
Foundation, carrier system, facade and roof works have been performed in stages.
Installation of electrical, water, HVAC and low flow systems is integrated into the construction schedule.
Internal completion, testing, inspection and preparation for use have been carried out.
EXECUTION PROCESS
Initial data, requirements and possible technical limitations are defined.
Scope of work, resources and execution sequence are prepared according to the project.
Technical teams and operational phases are linked to a single control.
The work performed has been evaluated and the results have been documented accordingly.
PROJECT OUTCOME
The coordination of architectural and engineering work has made it possible to form a functional, safe and ready-to-use object.