Drilling and well workover

Technical planning and delivery of drilling, workover and well intervention operations.

Integrated approach from planning to results

Well operations are planned based on geological data, technical programme and field safety requirements. Coordination between engineering, equipment and operational staff is ensured.

Division
Oil & Gas services
Business model
Comprehensive project approach
Basic Principle
Quality, safety and coordination
Drilling and well repair work

Main project scope

The works were delivered under a single execution plan that accounted for technical requirements, site conditions and dependencies between stages.

01

Data analysis

Well construction, geological conditions and previous operational data were reviewed.

02

Operating programme

Drilling or repair sequence, resources and control points are defined.

03

Field execution

Equipment, service staff and daily operations are coordinated under a single programme.

04

Final assessment

Operational data and technical results were analysed and final documents were prepared.

Controlled four stages

  1. 01

    Evaluation

    Initial data, requirements and possible technical limitations are defined.

  2. 02

    Planning

    The scope, resources and execution sequence were defined to suit the project.

  3. 03

    Implementation and coordination

    Technical teams and operational phases are linked to a single control.

  4. 04

    Inspection and handover

    The work performed has been evaluated and the results have been documented accordingly.

Controlled execution. Clear result.

Planned engineering and field coordination enabled well operations to be carried out in a controlled sequence.