Data analysis
Well construction, geological conditions and previous operational data were reviewed.
ABOUT THE PROJECT
Well operations are planned based on geological data, technical program and field safety requirements. Coordination between engineering, equipment and operational staff is ensured.

WORKS DONE
Works were organized according to a single implementation plan taking into account technical requirements, site conditions and inter-stage dependencies.
Well construction, geological conditions and previous operational data were reviewed.
Drilling or repair sequence, resources and control points are defined.
Equipment, service staff and daily operations are coordinated under a single program.
Operational data and technical results were analyzed and final documents were prepared.
EXECUTION PROCESS
Initial data, requirements and possible technical limitations are defined.
Scope of work, resources and execution sequence are prepared according to the project.
Technical teams and operational phases are linked to a single control.
The work performed has been evaluated and the results have been documented accordingly.
PROJECT OUTCOME
Planned engineering and field coordination enabled well operations to be carried out in a controlled sequence.