Data analysis
Well construction, geological conditions and previous operational data were reviewed.
ABOUT THE PROJECT
Well operations are planned based on geological data, technical programme and field safety requirements. Coordination between engineering, equipment and operational staff is ensured.

DELIVERED WORKS
The works were delivered under a single execution plan that accounted for technical requirements, site conditions and dependencies between stages.
Well construction, geological conditions and previous operational data were reviewed.
Drilling or repair sequence, resources and control points are defined.
Equipment, service staff and daily operations are coordinated under a single programme.
Operational data and technical results were analysed and final documents were prepared.
EXECUTION PROCESS
Initial data, requirements and possible technical limitations are defined.
The scope, resources and execution sequence were defined to suit the project.
Technical teams and operational phases are linked to a single control.
The work performed has been evaluated and the results have been documented accordingly.
PROJECT OUTCOME
Planned engineering and field coordination enabled well operations to be carried out in a controlled sequence.