Fire Protection Systems

Inspection and maintenance of fire detection, alarm and suppression systems.

Integrated approach from planning to results

Fire safety systems have been tested for equipment, signaling and interaction scenarios. Technical service is aimed at assessing the functional readiness of all the main elements of the system.

Division
Engineering solutions & Maintenance
Business model
Comprehensive project approach
Basic Principle
Quality, safety and coordination
Fire safety systems works

Main project scope

The works were delivered under a single execution plan that accounted for technical requirements, site conditions and dependencies between stages.

01

Visual and technical inspection

The condition of the detector, panel, warning and shutdown elements has been checked.

02

Functional tests

Test scenarios for alarms, zones and control connections have been executed.

03

Service and adjustment

Cleanup, debugging, and required component interventions have been performed.

04

Documentation of results

Inspection results, detected issues, and actions performed have been logged.

Controlled four stages

  1. 01

    Evaluation

    Initial data, requirements and possible technical limitations are defined.

  2. 02

    Planning

    The scope, resources and execution sequence were defined to suit the project.

  3. 03

    Implementation and coordination

    Technical teams and operational phases are linked to a single control.

  4. 04

    Inspection and handover

    The work performed has been evaluated and the results have been documented accordingly.

Controlled execution. Clear result.

The continuous inspection and service system ensured the evaluation of the interaction of fire safety elements and readiness for operation.