System audit
The condition of equipment, air ducts, filters and control elements has been assessed.
ABOUT THE PROJECT
HVAC systems were evaluated for indoor environmental parameters, equipment loads, and operating schedule. The service plan took into account the interaction of individual elements of the system.

WORKS DONE
Works were organized according to a single implementation plan taking into account technical requirements, site conditions and inter-stage dependencies.
The condition of equipment, air ducts, filters and control elements has been assessed.
Cleaning, filter change, mechanical inspection and required adjustments have been performed.
Temperature, air consumption and control parameters are adjusted according to the usage conditions.
The system has been checked in various modes and the work done has been registered.
EXECUTION PROCESS
Initial data, requirements and possible technical limitations are defined.
Scope of work, resources and execution sequence are prepared according to the project.
Technical teams and operational phases are linked to a single control.
The work performed has been evaluated and the results have been documented accordingly.
PROJECT OUTCOME
Comprehensive maintenance ensured the connected operation of HVAC equipment and more stable management of indoor environment parameters.