Construction

Hydrotechnical infrastructure

Complex construction works on reservoirs, dams, irrigation canals and water networks.

Integrated approach from planning to results

The project is planned with safe water management and long-term infrastructure operation in mind. Technical solutions are coordinated according to site conditions, hydraulic requirements and construction sequence.

Division
Construction
Business model
Comprehensive project approach
Basic Principle
Quality, safety and coordination
Hydraulic infrastructure works
Hydrotechnical infrastructure — visual representation of the work process.

Main project scope

Works were organized according to a single implementation plan taking into account technical requirements, site conditions and inter-stage dependencies.

01

Technical Preparation

Field data and hydraulic requirements were analyzed and an implementation plan was prepared.

02

Earth and concrete works

Foundation preparation, concrete and construction works for the dam, channel and facilities have been completed.

03

Network construction

Water lines, transitions and related technological elements are installed on a single system.

04

Test and delivery

The systems were checked, the quality of work was evaluated and the handover documents were prepared.

Controlled four stages

  1. 01

    Evaluation

    Initial data, requirements and possible technical limitations are defined.

  2. 02

    Planning

    Scope of work, resources and execution sequence are prepared according to the project.

  3. 03

    Implementation and coordination

    Technical teams and operational phases are linked to a single control.

  4. 04

    Inspection and handover

    The work performed has been evaluated and the results have been documented accordingly.

Controlled execution. Clear result.

Comprehensive coordination integrates the separate elements of the water infrastructure into a single, controlled and ready-to-operate system.

← All projectsLet's discuss your project ↗