Condition assessment
The equipment underwent an initial visual, mechanical and operational inspection.
ABOUT THE PROJECT
Maintenance is planned taking into account the operating mode, condition and manufacturer requirements of the equipment. Diagnostic results were used to determine the scope of work and sequence of interventions.

DELIVERED WORKS
The works were delivered under a single execution plan that accounted for technical requirements, site conditions and dependencies between stages.
The equipment underwent an initial visual, mechanical and operational inspection.
Priorities, spare parts and intervention sequences are defined.
Cleaning, adjustment, replacement of worn components and reassembly were completed.
The equipment was tested under operating conditions, and all completed work and observations were documented.
EXECUTION PROCESS
Initial data, requirements and possible technical limitations are defined.
The scope, resources and execution sequence were defined to suit the project.
Technical teams and operational phases are linked to a single control.
The work performed has been evaluated and the results have been documented accordingly.
PROJECT OUTCOME
A condition-based service approach ensured that mechanical equipment was restored to operational capability and that subsequent inspections were scheduled.