Load calculation
The main calculation indicators for electricity, heating, cooling and water demand have been determined.
ABOUT THE PROJECT
MEP systems are designed with facility function, energy requirements and architectural constraints in mind. System routes and equipment zones are linked to other sections.

WORKS DONE
Works were organized according to a single implementation plan taking into account technical requirements, site conditions and inter-stage dependencies.
The main calculation indicators for electricity, heating, cooling and water demand have been determined.
Principal solutions for electrical, HVAC, water and related systems have been developed.
Equipment, shaft and communication routes are coordinated with architecture and construction.
Plans, schematics, specifications and technical notes are complete in a single package.
EXECUTION PROCESS
Initial data, requirements and possible technical limitations are defined.
Scope of work, resources and execution sequence are prepared according to the project.
Technical teams and operational phases are linked to a single control.
The work performed has been evaluated and the results have been documented accordingly.
PROJECT OUTCOME
Coordinated MEP project laid the foundation for efficient placement of engineering systems within the facility and planned subsequent assembly.