Construction

Marine Infrastructure

Implementation of port, jetty, breakwater and underwater construction solutions.

Integrated approach from planning to results

Works in marine conditions are planned taking into account the hydrological characteristics of the site, special technical and safety requirements. Shore and underwater operations are coordinated in a single execution sequence.

Division
Construction
Business model
Comprehensive project approach
Basic Principle
Quality, safety and coordination
Marine infrastructure works
Marine infrastructure — visual presentation of work process.

Main project scope

Works were organized according to a single implementation plan taking into account technical requirements, site conditions and inter-stage dependencies.

01

Assessment of marine conditions

Data on area, depth, wave and access possibilities are included in the implementation plan.

02

Hydraulic equipment

Construction works on port elements, piers and protective structures have been carried out.

03

Underwater operations

Underwater assembly, transition and dredging works were performed with special technical control.

04

Inspection and completion

Constructions, connections and work zones have been subjected to final control.

Controlled four stages

  1. 01

    Evaluation

    Initial data, requirements and possible technical limitations are defined.

  2. 02

    Planning

    Scope of work, resources and execution sequence are prepared according to the project.

  3. 03

    Implementation and coordination

    Technical teams and operational phases are linked to a single control.

  4. 04

    Inspection and handover

    The work performed has been evaluated and the results have been documented accordingly.

Controlled execution. Clear result.

Coordination of onshore and underwater works ensured safe and functional completion of marine infrastructure elements.

← All projectsLet's discuss your project ↗