Specification of requirements
Equipment parameters, standards and assembly requirements have been checked on technical request.
ABOUT THE PROJECT
The supply process was controlled by a single control chain from specification of the technical request to the acceptance of the equipment. Compliance documents and logistics stages are coordinated in parallel.

DELIVERED WORKS
The works were delivered under a single execution plan that accounted for technical requirements, site conditions and dependencies between stages.
Equipment parameters, standards and assembly requirements have been checked on technical request.
The manufacturer and product selection was made on the basis of technical compliance and documentation.
Transport, packaging and delivery were sequenced to match the project schedule.
Product completeness and accompanying technical documents were checked during delivery.
EXECUTION PROCESS
Initial data, requirements and possible technical limitations are defined.
The scope, resources and execution sequence were defined to suit the project.
Technical teams and operational phases are linked to a single control.
The work performed has been evaluated and the results have been documented accordingly.
PROJECT OUTCOME
The combination of technical and logistics control ensured that the required equipment was delivered in the correct assembly and with a controlled process.