Site and route preparation
The work zone was prepared taking into account geodetic data, relief and existing communication lines.
ABOUT THE PROJECT
Road and bridge works were performed on the basis of traffic safety, structural sustainability and consistency of the construction process. All stages from site preparation to final coating were managed in a coordinated manner.

WORKS DONE
Works were organized according to a single implementation plan taking into account technical requirements, site conditions and inter-stage dependencies.
The work zone was prepared taking into account geodetic data, relief and existing communication lines.
The soil bed, drainage and bearing layers are formed according to the project requirements.
Coordinated concrete, metal and assembly works for bridge, crossing and road facilities.
Asphalt-concrete coating, marking and road safety elements have been completed.
EXECUTION PROCESS
Initial data, requirements and possible technical limitations are defined.
Scope of work, resources and execution sequence are prepared according to the project.
Technical teams and operational phases are linked to a single control.
The work performed has been evaluated and the results have been documented accordingly.
PROJECT OUTCOME
Work management with a single program ensured compatibility between road construction, engineering facilities and safety elements.