Site and route preparation
The work zone was prepared taking into account geodetic data, relief and existing communication lines.
ABOUT THE PROJECT
Road and bridge works were performed on the basis of traffic safety, structural sustainability and consistency of the construction process. All stages from site preparation to final coating were managed in a coordinated manner.

DELIVERED WORKS
The works were delivered under a single execution plan that accounted for technical requirements, site conditions and dependencies between stages.
The work zone was prepared taking into account geodetic data, relief and existing communication lines.
The subgrade, drainage and load-bearing layers were constructed to project requirements.
Concrete, structural-steel and installation works were coordinated across bridges, crossings and road structures.
Asphalt-concrete coating, marking and road safety elements have been completed.
EXECUTION PROCESS
Initial data, requirements and possible technical limitations are defined.
The scope, resources and execution sequence were defined to suit the project.
Technical teams and operational phases are linked to a single control.
The work performed has been evaluated and the results have been documented accordingly.
PROJECT OUTCOME
Work management with a single programme ensured compatibility between road construction, engineering facilities and safety elements.