Well completion

Preparation of the well for production and implementation of completion systems.

Integrated approach from planning to results

The completion solution is tailored to the well construction, reservoir conditions and planned operating regime. Hardware selection, installation sequence and testing are combined in one programme.

Division
Oil & Gas services
Business model
Comprehensive project approach
Basic Principle
Quality, safety and coordination
Well completion scope of work

Main project scope

The works were delivered under a single execution plan that accounted for technical requirements, site conditions and dependencies between stages.

01

Finishing design

A completion design was developed to suit the well parameters and operating objectives.

02

Equipment preparation

Finishing elements have been assembled, compatibility and work readiness checks have been carried out.

03

Downhole installation

Equipment is deployed with approved sequence and operational control.

04

Test and commissioning

The system functions have been checked and the well has been prepared for the next phase of operation.

Controlled four stages

  1. 01

    Evaluation

    Initial data, requirements and possible technical limitations are defined.

  2. 02

    Planning

    The scope, resources and execution sequence were defined to suit the project.

  3. 03

    Implementation and coordination

    Technical teams and operational phases are linked to a single control.

  4. 04

    Inspection and handover

    The work performed has been evaluated and the results have been documented accordingly.

Controlled execution. Clear result.

Coordination of the completion stages prepared the well system for its planned operating mode.