Well logging

Acquisition and analysis of well data and evaluation of formation parameters.

Integrated approach from planning to results

Geophysical survey programme is developed based on the well condition and required formation data. Measurement, quality control and interpretation phases were managed by a single data flow.

Division
Oil & Gas services
Business model
Comprehensive project approach
Basic Principle
Quality, safety and coordination
Well logging scope of work

Main project scope

The works were delivered under a single execution plan that accounted for technical requirements, site conditions and dependencies between stages.

01

Survey programme

A technical programme was developed around the measurement objectives, tool string and well conditions.

02

Data collection

Downhole measurements were performed in accordance with operating procedures.

03

Quality control

Obtained curves and main measurement parameters were checked for completeness and reliability.

04

Interpretation

Data were analysed and technical results were formed on the reservoir and well condition.

Controlled four stages

  1. 01

    Evaluation

    Initial data, requirements and possible technical limitations are defined.

  2. 02

    Planning

    The scope, resources and execution sequence were defined to suit the project.

  3. 03

    Implementation and coordination

    Technical teams and operational phases are linked to a single control.

  4. 04

    Inspection and handover

    The work performed has been evaluated and the results have been documented accordingly.

Controlled execution. Clear result.

Structured measurement and interpretation provided clearer well and reservoir data for decision making.

← All projectsLet's discuss your project ↗